Ultrathin Bonded Asphalt Surface improvements for two miles of Lamar Ave. located in Mission, Kansas from Foxridge Drive to Shawnee Mission Parkway. Project also included concrete curb and sidewalk improvements, pavement marking with bike lanes and storm sewer reconstruction at the 51st Street intersection. Pfefferkorn provided construction inspection and materials testing.